BFEW executes the construction of technically complex and high value projects. Our diverse expertise and talents enable us to offer our clients the complete range of Engineering, Procurement and Construction ( EPC) services that bridge all the clients construction needs.


CLIENT: CEMEX CEMENT (BD) LTD.


Construction work of the cement plant including structural steel warehouse, Fabrication of mechanical equipment, Bin, Hopper, bag fitter, Air slides, Steel structures, conveyor system, and erection of all mechanical & electrical items including instrumentation and commissioning.


CLIENT: OCCIDENTAL OIL COMPANY LIMITED


Construction work of the cement plant including structural steel warehouse, Fabrication of mechanical equipment, Bin, Hopper, bag fitter, Air slides, Steel structures, conveyor system, and erection of all mechanical & electrical items including instrumentation and commissioning.


CLIENT: KVAERNER PROCESS SYSTEM ASIA PACIFIC.


Construction of a Gas Treatment Plant at Lakatura – Sylhet for Jalalabad Gas Treatment plant. The job included fabrication of pipe spools , erection of mechanical equipment, piping works, erection of pre-engineered building, mechanical erection work, construction of tank firm for 6 nos large dia tanks , electrical instrumentation and commissioning works..


CLIENT:PETROBANGLA – RPGCL (MAIN CONTRACTOR – HYUNDAI ENGINEERING CO. LTD- KOREA.


Construction work including civil work sand piling, piping structural fabrication, erection electrification instrumentation and commissioning of all mechanical & electrical equipment for 5000 TPA LPG Plant at Kailashtilla – Sylhet District.


CLIENT:OCCIDENTAL OIL CO. LTD (A U.S OIL COMPANY OPERATING IN BANGLADESH)


Construction of a 4.5 Km X 5.2 M heavy Duty all weather road through forest and hill at Sylhet including 17 R.C.C. Box culverts.


CLIENT:PETROBANGLA SYLHET GAS FIELDS CO. LTD (MAIN CONTRACTOR – PRESS CONSTRUCTION LTD, DARLINGTON – UK.)


Fabrication, erection, electrification and instrumentation work of a Molecular Sieve Turbo Expander type Gas Treatment Plant 90 mm cfd at Kailashtilla in Sylhet district


CLIENT:CHITTAGONG PORT AUTHORITY (MAIN CONTRACTOR - CHINA HARBOUR ENGINEERING CO. LTD)


Fabrication, erection, electrification and instrumentation work of a Molecular Sieve Turbo Expander type Gas Treatment Plant 90 mm cfd at Kailashtilla in Sylhet district


CLIENT:CHHATAK CEMENT CO. LTD.


Erection of Machinery for expansion of Chhatak Cement plant including Cement Mill, Electrostatic Precipitator, kiln and other equipment and accessories.


CLIENT:JAMUNA FERTILIZER CO. LTD (BANGLADESH CHEMICAL INDUSTRY CORPORATION).


Construction – 2 nos 5 storied Hostel building for the expatriates, one 4- storied Bachelors officers Hostel, one bachelor employees Hostel, one 60m high overhead water Tank and river bank protection work at Tarakandi, Jamalpur district.


CLIENT: BANGLADESH RAILWAY (MAIN CONTRACTOR – DAEWOO CORPORATION, KOREA)


For construction of Parbatipur Railway Backshop, fabrication of 1200 Mt of steel structure at the premises of Chittagong Dry Dock and fabrication and erection work of mechanical and electrical equipment and utility services at Parbatipur.


CLIENT: ROADS AND HIGHWAYS DEPT (MAIN CONTRACTOR – JOINT VENTURE INTERBETON HCG OF HOLLAND.


Construction of 2nd Karnafuli Bridge ( Shah Amanat Bridge) at Chittagong over Karnafuli river measuring 922m long. The work included pier installation (2 m dia steel piers) fabrication and erection of entire steel structure , sand blasting & painting, construction of R.C.C abutment, installation and surface treatment to the wooden deck.


CLIENT: CHITTAGONG UREA FERTILIZER LTD.


Construction of including Fabrication and erection of 9 nos. Steel Vertical Tank ( Total Weight of the Steel used – 2100 MT) for the Water Treatment Plant under Kurita Water Industries Ltd of Japan.


CLIENT: BANGLADESH POWER DEVELOPMENT BOARD (MAIN CONTRACTOR – MARUBENI CORPORATION, JAPAN)


Erection of 2 nos water Turbine with generator, 52 MW each for the Kaptai Hydro power station ( Unit no 4 and 5).


CLIENT: TSP COMPLEX LTD BANGLADESH CHEMICAL INDUSTRIES CORPORATION, CHITTAGONG.


Dismantling & reconstruction of a 500 ton/day Sulpheric Acid plant including fabrication of Absorbing Tower, Drying Tower and 60 m high main stack including all internals, acid resistant bricks pumps, pipings and other accessories.


CLIENT: HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD., KOREA- EPC CONTRACTOR, ELECTRICITY GENERATION COMPANY OF BANGLADESH LIMITED - OWNER


New Haripur 412MW CCPP Project Civil Works of Power Block of New Haripur 360 MW Power Plant Project, Bangladesh.