BFEW executes the construction of technically complex and high value projects. Our diverse expertise and talents enable us to offer our clients the complete range of Engineering, Procurement and Construction (EPC) services that bridge all the client's construction needs.

Photo Gallery

Client: Essential Drugs Company Limited., Ministry of Health, Govt. of Bangladesh
Civil Construction & Plumbing Work of Gopalganj 3rd Plant, Bangladesh.
 
Client: CCC Engineering Ltd. House-485, Road-8, DOHS, Baridhara, Dhaka-1206, Bangladesh
Construction of Jigatola 132/33 kV GIS Substation
 
Client: The First Engneering Bureau of Henan Water Conservancy, No. 77, Anping Road, Zhengzhou City, Henan, China, 450004
Rehabilitation/Reconstruction and upgrading of Polder 35/1 at Sarankhola, Bagerhat under CEIP-I Project of Bangladesh Water Development Board.
 
Client: Islamic University, Kushtia
Construction of 5 storied foundation of 2nd Arts Faculty up to 1st floor including civil, sanitary and electrical works at I.U campus.
 
Client: LLC Inter RAO-Engineering, Bldg. 4, Pirogovskaya Str., Bolshaya, Russian Federation, 119435 Contractor to Rooppur Nuclear Power Plant
Construction of foundations and supply/ installation of steel structures) at Amenity Building (it.6.4)
 
Client: LLC Inter RAO-Engineering, Bldg. 4, Pirogovskaya Str., Bolshaya, Russian Federation, 119435 Contractor to Rooppur Nuclear Power Plant
External Lighting, Installation of Well and Domestic & Fire Pipeline.
 
Client: Shah Cement Industries Ltd., Mukterpur, Munshiganj
Fabrication of non-standard items, erection of equipment and building structures including transportation.
 
Client: ORGENERGOSTROY, Bld., 7/10, Derbenevskaya nab., Moscow, Russian Federation, 115114 Contractor to Rooppur Nuclear Power Plant
Works on the construction of the Metal open storage with crane trestle of the Rooppur 2 x 1000 MW Nuclear Power Plant under additional Contract No. 1.
 
Client: HQ Border Guard Bangladesh, Peelkhana, Dhaka.
Construction of 1 x Ware House for Works Branch at BGB Headquarters, Peelkhana, Dhaka.
 
Client: ORGENERGOSTROY, Bld., 7/10, Derbenevskaya nab., Moscow, Russian Federation, 115114 Contractor to Rooppur Nuclear Power Plant
Works on the construction of the Pilot Bases Facilities of the Rooppur 2 x 1000 MW Nuclear Power Plant under 15 (fifteen) additional Contracts.
 
Client: Hyundai Engineering Co. Ltd., Korea-Contractor, BD Gas Transmission Co Ltd.- Owner
Civil, Building & Steel Structure works of Compressor Station Project at Ashuganj & Elenga, Bangladesh.
 
Client: Meghna Petroleum Ltd, Bangladesh
Construction of 02 (two) nos POL Storage Fixed Roof Vertical Steel Tanks Appx. capacity 10000 MT each at main installation at Chittagong.
 
Client: Gas Transmission Company Limited, Bangladesh
Construction of 36" OD x 1000 psig Gas Transmission Pipeline from North Bank of Kalni River to East Bank of Dhanu River.
 
Client: Hyundai Engineering & Construction Co. Ltd., Korea - EPC Contractor, Owner - EGCB
Civil Works of Power Block of New Haripur 360 MW Power Plant Project, Bangladesh.
 
Client: DHAKA WEST POWER LTD., Road No. 16 (old-27), House No. 18 (old-405) 5th Floor, Dhanmondi R/A, Dhaka-1205, Bangladesh.
Development of project area (land) using dredged sand with compaction for 108-MW furnace oil-based plant in Bosila, Keraniganj.
 
Client: Gas Transmission Company Ltd (GTCL)
Installation of cross country 30" Gas Pipe line with all valves and appurtenances, Tie-ins, testing and commissioning.
 
Client: Bangladesh Inland Water Transport Authority
Construction & Placement of 30 numbers 30.5m X 7.62m X 1.83m Terminal Pontoons.
 
Client: CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd.
Fabrication, Erection and Testing of 9 Steel Storage Tanks for Condensate, Clean Produced Water, Dirty Produced Water and Fire Water.
 
Client: Lafarge Surma Cement plant (Main contractor Larsen & Toubro (ECC Division of India)
Construction of a 10 Km Cross- Country Long Belt Conveyor (which is a part of 17.5 km conveyor from Meghalaya in India up to Chhatak in Bangladesh).
 
Client: CHEVRON / UNOCAL Bangladesh Block- Twelve Ltd.
Construction of a 22 KM 30" dia cross country gas pipeline, 6" dia condensate pipeline and 14" dia 23 KM sales gas pipeline in the Bibiyana gas pipeline construction project.
 
Client: Mobil- Jamuna Lubricants Ltd.
Procurement & Construction of civil & building works, fabrication and erection of process tanks, erection of plant mechanical, electrical & instrumentation works at Lubricant Blending Plant of Mobil Januma at Patenga, Chittagong.
 
Client: Holcim Cement Plant ( Holder bank group)
Fabrication and erection of extension project of Holcim Cement plant at Meghnaghat.
 
Client: Hydelberg Cement Co. Ltd (Main Contractor - Doosan heavy Industries & Construction Co. Ltd of Korea.
Complete Mechanical, Fabrication and erection of plant equipment including ball mill of capacity 1600 ton/ day cement grinding plant at Rupganj.
 
Client: Cemex Cement (BD) Ltd.
Construction work of the cement plant including structural steel warehouse, fabrication of mechanical equipment, bin, hopper, bag fitter, air slides, steel structures, conveyor system and erection of all mechanical & electrical items including instrumentation and commissioning.
 
Client: Kvaerner Process System Asia Pacific.
Mechanical Construction of a Gas Treatment Plant at Lakatura - Sylhet for Jalalabad Gas Treatment plant included electrical instrumentation and commissioning works.
 
Client: Petrobangla - RPGCL ( Main Contractor - Hyundai Engineering Co. Ltd- Korea.
Construction work including civil work, sand piling, piping, structural fabrication, erection, electrification, instrumentation and commissioning of all mechanical & electrical equipment for 5000 TPA LPG Plant at Kailashtilla - Sylhet District.
 
Client: Occidental Oil Co. Ltd (a U.S Oil company Operating in Bangladesh)
Construction of a 4.5 Km X 5.2 M heavy Duty all weather road through forest and hill at Sylhet including 17 R.C.C. Box culverts.
 
Client: Petrobangla Sylhet Gas Fields Co. Ltd (Main Contractor - Press Construction Ltd, Darlington - UK.)
Fabrication, erection, electrification and instrumentation work of a Molecular Sieve Turbo Expander type Gas Treatment Plant 90 mm cfd at Kailashtilla in Sylhet district.
 
Client: Chhatak Cement Co. Ltd (Bangladesh chemical industries Ltd) & Korea heavy Industries & Construction Co. Ltd.)
Erection of Machinery for expansion of Chhatak Cement plant including Cement Mill, Electrostatic Precipitator, kiln and other equipment and accessories.
 
Client: Jamuna Fertilizer Co. Ltd (Bangladesh Chemical Industry Corporation).
Construction - 2 nos 5 storied Hostel building for the expatriates, one 4- storied Bachelors officers Hostel, one bachelor employees Hostel, one 60m high overhead water Tank and river bank protection work at Tarakandi, Jamalpur district.
 
Client: Bangladesh Railway (Main Contractor - Daewoo Corporation, Korea)
For construction of Parbatipur Railway Backshop, fabrication of 1200 Mt of steel structure at the premises of Chittagong Dry Dock and fabrication and erection work of mechanical and electrical equipment and utility services at Parbatipur.
 
Client: Roads and Highways Dept (Main contractor - Joint venture Interbeton HCG of Holland.
Construction of 2nd Karnafuli Bridge ( Shah Amanat Bridge) at Chittagong over Karnafuli river measuring 922m long. The work included pier installation (2 m dia steel piers) fabrication and erection of entire steel structure, sand blasting & painting, construction of R.C.C abutment, installation and surface treatment to the wooden deck.
 
Client: Chittagong Urea Fertilizer Ltd.
Construction of including fabrication and erection of 9 nos. Steel Vertical Tank ( Total Weight of the Steel used - 2100 MT) for the Water Treatment Plant under Kurita Water Industries Ltd of Japan.
 
Client: Bangladesh Power Development Board (Main contractor - Marubeni Corporation, Japan)
Erection of 2 nos water Turbine with generator, 52 MW each for the Kaptai Hydro power station ( Unit no 4 and 5).
 
Client: TSP Complex Ltd Bangladesh Chemical Industries Corporation, Chittagong.
Dismantling & reconstruction of a 500 ton/day Sulpheric Acid plant including fabrication of Absorbing Tower, Drying Tower and 60 m high main stack including all internals, acid resistant bricks pumps, pipings and other accessories.