Major Project Completed


BFEW is distinguished by its boldness of vision, courage and confidence it displays in taking on the toughest challenges. The ability to take on challenges has enabled us to successfully execute projects that have been new to our experience.


SL

Client

Scope of Work

Year of Completion

52

Chevron Bangladesh Block Twelve, Ltd.

Construction of Surface Drain for Bibiyana Gas Plant. The Works Consist of : Excavation Works, Sub Base Works, Base Works, Bituminous Carpeting Works and Seal Coat Works.

2008

53

BSRM Steels Limited

Erection installation and commissioning of Hot Rolling Mill Machineries and equipment complete with all supporting accessories for BSRM at Chittagong.

2008

54

Bangladesh Inland Water Transport Authority

Construction & Placement of 30 numbers 30.5m X 7.62m X 1.83m Terminal Pontoons.

2007

55

CHEVRON/UNOCAL Bangladesh Block-Twelve Ltd.

Construction of 10 Km Cross- Country Long Belt Conveyor (which is a part of 17.5 km conveyor from Meghalaya in India up to Chhatak in Bangladesh). The work includes- 1.survey, piling work ( 1400 nos) construction of pile cap and R.C.C Trestles 10 to 12 m high – 400 nos along the entire route, fabrication and erection of conveyor gallery. 2. Belt installation, electrical, Works, cladding as well as painting works.

2007

56

Lafarage Surma Cement (Main contractor Larsen & Toubro, ECC Division Of India).

Erection of 9 numbers API welded Steel Storage Tanks for Condensate, clean produced water, dirty produces water and fire water.

2006

57

CHEVRON/UNOCAL Bangladesh Block-Twelve Ltd

Construction of a 22km 30' dia cross country gas pipeline and a 6 dia condensate line in the Bibiyana gas pipeline construction project. This work include: 1. Construction of 2 nos valve station 2. Hill Boring by HDD method.

2006